Case Study: A Household Products Manufacturer

Custom work is our specialty, but it’s our people and attention to detail that makes us special.


proctor-gamble-case-study

PROJECT REQUIREMENTS

  • Provide replacement unit with additional capacity and features not included with original equipment.
  • Unit construction is aluminum in order to reduce unit weight.
  • Site requirements dictated that unit installation be completed over a holiday weekend, therefore the unit was to be provided pre-piped and wired for installation.

MARCRAFT’s TRUCustom™ SOLUTION

Working side-by-side with the Project Engineer and the Customer’s team, MarCraft designed, engineered and built a custom air handling unit to meet facility requirements with the same footprint for direct replacement.

RESULTS

MarCraft’s TRUCustom™ units are providing the reliability and efficiency that one of the world’s top consumer brands needs to serve its customers.